Jun 05, 2025  
2025-2026 Cal Maritime Catalog (Draft) 
    
2025-2026 Cal Maritime Catalog (Draft)

EPO 230 - Steam Plant System Operations


Lab Hours: 2, Units: 1
STCW Requirement: ♦
Prerequisite(s): CRU 150 , EPO 125 
A hands-on learning experience in the Steam Plant Simulator. An introduction to the engineering systems, operating and emergency procedures, and watch requirements of a steam propulsion plant.
ET